Celltarga were appointed as the principle contractor for the Reception upgrade works at offices in London.
Celltarga secured a contract to develop a frictionless bar for Brighton and Hove Albion FC.
We were assigned a project at a hotel, which primarily involved builders' work on 10 apartments and suites.
The design and build office fit out works to the ground floor and second floor at a 5 storey building.
The works at Castle Mews varied from initial demolition, protection and clearance to drainage, new arch lining and providing new M&E services.
Celltarga were awarded a project in London to complete enabling and fit out works for a new café unit within an existing commercial premises.
A complete refurbishment of an apartment complex, located in Piccadilly, London.
Celltarga were appointed a project in Surrey to complete a refurbishment of several communal areas of a County Club for their members.
Celltarga were appointed by Mitie to oversee and assist with the refurbishment of the WC’s and showers on the ground floor, level 2,3,4, and 5.
Celltarga were assigned a refurbishment project for the first-floor toilets in Millbank.
Celltarga undertook the fit out of the warehouse in Bessemer Park, Sheffield. This is a new build warehouse unit of 135,625 Sq ft requiring client specific fit out.
The site was based within a small industrial estate formed solely of railway arches, where two derelict arches required full refurbishment to the exteriors and interiors.
To create a collaborative, informal meeting space that allows staff to be able to work and relax in a comfortable space.
The project consisted of completing a demise split of an office in London.
The unit was a shell fit out with capped landlords’ services and the works involved completing a fit out of the unit to form a male, female and accessible WC and a bike store.
This project consisted of transforming a CAT A space to a functional office space. The works included demolition, ceiling alterations, acoustic barriers and redecorations.
A complete refurbishment to reception, dining room and foyer.
The works comprised of the alteration and refurbishment of the ground floor laboratory area creating two new laboratories.
Cat A fit out of 2 floors and WC facilities. Including new lift surrounds, raised access flooring, refurbishment of existing windows, new fan coils units, lighting scheme and ceilings.
Celltarga worked with Weightmans to develop an office refurbishment specification for there main central London Head Office.