Client: LFDY
Location: London
Project Value: £140k
Programme: 7 weeks
Project Management
Health and Safety
Handover Documentation
The scope of works for this full shop fit-out project encompassed a comprehensive range of tasks to transform the space into a functional and aesthetically pleasing retail environment.
The initial phase included demolition and dismantling works, followed by modifications to their existing HVAC systems and electrical works.
The design package for this project included decorations to all walls including installation of mirrored wall surfaces, wooden walls, painting and tiling works. New flooring was installed throughout the shop with carpet installed in the changing rooms. Tiling was installed on the floor upstairs in the main area of the shop and WC.
This project was completed with a focus on meeting the shop’s operational and visual requirements.