OUR SERVICES / PLANNED MAINTENANCE / QUEEN VICTORIA HOSPITAL 

PLANNED MAINTENANCE

HOSPITAL STREET, QUEEN VICTORIA HOSPITAL, EAST GRINSTEAD

Client:

QVH NHS Foundation Trust

Contract Type:

Queen Victoria Hospital NHS Foundation Terms and Conditions of Contract
Contract Value: 

£83,000

Contract Period:

6 weeks started March 2019

Brief/Scope of works:

The brief included the complete refurbishment of the main corridor known as the “Hospital St”.  Due to this being the main entrance and thoroughfare for the hospital and that it is in constant use throughout the day during normal hours all works will need to be undertaken out of hours. 

It was also be necessary to ensure that between periods of work the corridor is safe for public access, free from hazards and sufficiently lit.

 

The scope included:

 

  • Strip out and removal of the old materials

  • New ceilings

  • Clad white rock walls

  • Flooring

  • Fire rated doors

  • Lighting

  • Fire Smoke heads

  • •ecorations

  • Roller shutters to reception

  • Bump rails

Challenges:

The works were delivered Out of Hours during evenings and weekends keep away from public. As the corridor is near wards consideration was given to the noisier operations that were carried out at the start of the shift.

 

Upon completion of the days works the area was left clear of materials and slips trips or risks of falls.

© Celltarga Limited 2021. All rights reserved

UK Registered Company   01761432

website by scoopsweb

VAT Registration GB 372869802

Celltarga Built Environment Solutions

BUILT ENVIRONMENT SOLUTIONS