FIRE INSTALLATION
NATIONAL PHYSICS LABORATORY
Brief/Scope of works:
Celltarga have undertaken several projects during 2020 on the National Physics Laboratory (NPL) campus in Teddington.
This project was to undertake firestopping works to the existing occupied client area. Works included a series of fire stopping penetrations from the plant room through a blockwork wall following numerous retrofit M&E installations over the years, fire stopping ceiling to central corridors and new fire stopping to stair wells.
All works were designed, undertaken and documented with details passed to the client for inclusion in the building register.



Challenges:
The main challenge to the works was to gain safe access to the higher levels in amongst existing services.