NATIONAL PHYSICS LABORATORY

National Physics Laboratory

Client:

ISS

Contract Type:

NEC3

Contract Period:
4 weeks
Project Value:

£35,000

Start on site date:

December 2020

Brief/Scope of works:

Celltarga have undertaken several projects during 2020 on the National Physics Laboratory (NPL) campus in Teddington.

This project was to undertake firestopping works to the existing occupied client area. Works included a series of fire stopping penetrations from the plant room through a blockwork wall following numerous retrofit M&E installations over the years, fire stopping ceiling to central corridors and new fire stopping to stair wells.

All works were designed, undertaken and documented with details passed to the client for inclusion in the building register.

Challenges:

The main challenge to the works was to gain safe access to the higher levels in amongst existing services.

© Celltarga Limited 2021. All rights reserved

UK Registered Company   01761432

website by scoopsweb

VAT Registration GB 372869802

Celltarga Built Environment Solutions

BUILT ENVIRONMENT SOLUTIONS