OUR SERVICES / FIT-OUT CAT-B / SOUTH QUAY PLAZA

SOUTH QUAY PLAZA 10TH & 11TH FLOOR, CANARY WHARF

FIT-OUT CAT - B

Contract Type:

NEC3

Contract Period:

8 weeks + extensions due to increased scope

Client:

ISS
Project Value:

£350,000

Architect/Engineer:

Cox Design & Consult

Brief/Scope of works:

The main works carried out by Celltarga include the strip out of the existing office arrangements including office space meeting rooms toilets and kitchens.

​

Celltarga were then contracted to put back a new office layout comprising solid partitions glazed meeting rooms and offices, this included a new executive washrooms and tea station/kitchen.

​

The new reception was incorporated into the 11th floor which includes a bespoke joinery to the reception ceiling and wall made from oak and two reception pods rise and fall desks with marble tops.

​

Within the board room on the 11th floor a timber slatted wall was designed and installed to include all the audio-visual equipment.

​

The full scope included new partitions, M&E, plaster, fire doors, ceilings, power and lighting, toilets. All works were designed with the architect Cox in compliance with the output specification.

​

The contract was delivered on programme and budget through the Covid-19 period of 2020.

Challenges:

The main challenge was to deliver the works in a live office building maintain services to other parts of the floor and safely moving materials in and out of a live office environment. To enable this the building lifts were used out of hours for movement of bulky materials.

​

We had to work closely with client to manage the design and specification.

© Celltarga Limited 2021. All rights reserved

UK Registered Company   01761432

website by scoopsweb

VAT Registration GB 372869802

Celltarga Built Environment Solutions

BUILT ENVIRONMENT SOLUTIONS